Expansion Project for Ward 2 of Dongguan Municipal Traditional Chinese Medicine Hospital
2024-06-03
Project Type: Public Construction
Product Category: Flat-top Tower Crane
Product Advantages:
The Phase II Expansion and Reconstruction Project of Dongguan Hospital of Traditional Chinese Medicine is a medical building with 2 underground floors and 16 above-ground floors. The construction requires simultaneous multi-floor operations, and the hospital project needs to balance normal operation and construction safety. AISUN flat-top tower cranes adopt a tower-top-free structure with a lower overall height and can be flexibly arranged within the limited working area of the hospital compound. When multiple tower cranes work in overlapping areas, the height difference can be controlled to 3 meters, effectively reducing collision risks. Featuring stable operation and precise positioning, the cranes can well satisfy the hoisting requirements for the complex structure of medical buildings. Their safe, efficient and low-disturbance operation ensures the project proceeds as scheduled.
Previous page:
Related Articles
Contact Us
Email:
sino@gdyixin.net
Service Hotline:
+86 13926893097
Address:
Within the Fengchong Industrial Zone, Fengchong Village, Zhongtang Town, Dongguan City, Guangdong Province
Dongguan Yixin Qingjiang Machinery Manufacturing Co., Ltd.
Phone:13926893097
Address: Fengchong Industrial Zone, Fengchong Village, Zhongtang Town, Dongguan City, Guangdong Province
SEO | Powered by 300.cn Dongguan

